| Ünite | Ekipman | Main parameter | Typical failure |
|---|---|---|---|
| 1. Coil loading | Hydraulic decoiler, coil car | 5 to 10 t coil, 508 mm ID | Strip off centre, camber starts here |
| 2. Levelling and feeding | Straightener, servo feeder | Feed pitch 0.2 mm | Slip on oily strip |
| 3. Pre-punching | Hydraulic or servo punch | Hole pitch +/- 0.5 mm | Die wear, slug build-up |
| 4. Roll forming | 26 to 30 forming stands | 8 to 25 m/min | Edge wave, twist, bow |
| 5. End notching and cut-off | Notching press, flying shear | Cut length +/- 1 mm | Ragged cut, burr at notch |
| 6. Stacking | Magnetic or chain stacker | 15 to 25 bundles/h | Beam misalignment in bundle |
| Cut-off type | Hız | Cut quality | En iyi kullanım |
|---|---|---|---|
| Stop-and-cut hydraulic | 8 ila 12 m/dk | Good, slight burr | Low volume, mixed lengths |
| Flying shear | 20 ila 30 m/dk | Clean and square | Volume, fixed lengths |
| Uçan testere | 15 ila 25 m/dk | Clean, needs deburr | Thick section, heavy beam |
| Yapılandırma | Rated speed | Real 8 h output | Limiting station |
|---|---|---|---|
| Entry line, stop-and-cut, manual stack | 10 m/min | 90 to 110 beams | Cut-off stop time |
| Standard line, flying shear, auto stacker | 20 m/min | 180 to 220 beams | Stacker or coil change |
| Welded line, inline welding, auto stacker | 15 m/min | 140 to 170 beams | Weld cycle |
| Profil | Şekillendirme istasyonları | Punch position | Extra station |
|---|---|---|---|
| Kademeli kiriş | 26 to 30 | Pre-punch, flat strip | End notching |
| Kutu kiriş | 20 to 24 forming plus 4 to 6 seam | Pre-punch, flat strip | Seam welding, straightener |
| Upright column | 18 ila 24 | Form sonrası | 3 or 4 face punching |
| C bağlantısı | 10 to 14 | Ön delme | Yok |
Q: What is the correct order of operations in a step beam production process?
Q: Why is pre-punching better than punching after forming?
Q: How many forming stands does a step beam line need?
S: Hat ne kadar hızda çalışır?
Q: What causes hole position drift?
Q: What tolerance should a finished beam hold?
Step Beam Production Process: From Coil to Pallet Rack Beam...
Devamını OkuFencing & Security Roll Forming Machine: 5 Gate and Barrier...
Devamını Oku3 Strut Channel Roll Forming Makinesi Sevkiyata Hazır...
Devamını OkuHow Much Does a Floor Deck Roll Forming Machine Cost?...
Devamını Oku