| Stesen | Peralatan | Main parameter | Typical failure |
|---|---|---|---|
| 1. Coil loading | Hydraulic decoiler, coil car | 5 to 10 t coil, 508 mm ID | Strip off centre, camber starts here |
| 2. Levelling and feeding | Straightener, servo feeder | Feed pitch 0.2 mm | Slip on oily strip |
| 3. Pre-punching | Hydraulic or servo punch | Hole pitch +/- 0.5 mm | Die wear, slug build-up |
| 4. Roll forming | 26 to 30 forming stands | 8 to 25 m/min | Edge wave, twist, bow |
| 5. End notching and cut-off | Notching press, flying shear | Cut length +/- 1 mm | Ragged cut, burr at notch |
| 6. Stacking | Magnetic or chain stacker | 15 to 25 bundles/h | Beam misalignment in bundle |
| Cut-off type | Kelajuan | Cut quality | Sesuai untuk |
|---|---|---|---|
| Stop-and-cut hydraulic | 8 hingga 12 m/min | Good, slight burr | Low volume, mixed lengths |
| gunting terbang | 20 hingga 30 m/min | Clean and square | Volume, fixed lengths |
| Gergaji terbang | 15 hingga 25 m/min | Clean, needs deburr | Thick section, heavy beam |
| Konfigurasi | Rated speed | Real 8 h output | Limiting station |
|---|---|---|---|
| Entry line, stop-and-cut, manual stack | 10 m/min | 90 to 110 beams | Cut-off stop time |
| Standard line, flying shear, auto stacker | 20 m/min | 180 to 220 beams | Stacker or coil change |
| Welded line, inline welding, auto stacker | 15 m/min | 140 to 170 beams | Weld cycle |
| Profil | Stesen pembentukan | Punch position | Stesen tambahan |
|---|---|---|---|
| Rasuk bertangga | 26 to 30 | Pre-punch, flat strip | End notching |
| Rasuk kotak | 20 to 24 forming plus 4 to 6 seam | Pre-punch, flat strip | Seam welding, straightener |
| Upright column | 18 hingga 24 | Pasca-borang | 3 or 4 face punching |
| Penyokong C | 10 hingga 14 | Pra-tebuk | Tiada |
Q: What is the correct order of operations in a step beam production process?
Q: Why is pre-punching better than punching after forming?
Q: How many forming stands does a step beam line need?
Q: Berapa laju barisan ini berjalan?
Q: What causes hole position drift?
Q: What tolerance should a finished beam hold?
Cable Tray Line Downtime: 6 Causes and the Fix Order...
Baca lagiUpright Rack Line OEE: 6 Hidden Losses in Column Production...
Baca lagiZ Purlin Roll Forming Machine: 6 Changeover Features to Check...
Baca lagiCable Tray Production Cost per Meter: 6 Levers That Cut...
Baca lagi