ที่อยู่
เลขที่ 1 ถนน Yd เขตหุยซาน เมืองอู้ซี มณฑลเจียงซู 214183
เวลาทำการ
จันทร์ถึงศุกร์: 9AM - 5PM
เสาร์: 9AM - 4PM
คำตอบสั้น: False ceiling roll forming runs 0.30 to 0.50 mm galvanized strip at 40 to 60 m/min and produces main tees, cross tees, wall angles and furring channels. The roll set is the easy part. What decides whether the grid lies flat is punch accuracy on the cross tee tab and slot pitch on the main tee.
A ceiling grid looks simple until the first module goes up out of square. False ceiling roll forming works at 24 mm face width and 0.35 mm thickness, so every error a heavier profile would absorb shows at the joint.
False ceiling roll forming covers four profiles that ship as one system. The main tee carries load, the cross tee closes the module, the wall angle anchors the perimeter, and the furring channel serves the plasterboard and acoustic side of the same job.
| โปรไฟล์ | Face width | ความสูงของเว็บ | ความหนา | ความยาว |
|---|---|---|---|---|
| Main tee | 24 mm | 38 mm | 0.35 to 0.50 mm | 3.0 to 3.66 m |
| Cross tee | 24 mm | 32 มม. | 0.30 to 0.40 mm | 0.6, 1.2, 1.5 m |
| Wall angle | 23 to 24 mm | 23 to 24 mm | 0,40 ถึง 0,60 มม. | 3.0 m |
| Furring channel | 20 to 25 mm | 30 to 45 mm | 0,40 ถึง 0,60 มม. | Cut to order |
Main tee and cross tee share a face width because they must sit flush. They do not share a web height, and that 6 mm difference is what lets the cross tee tab drop into the main tee slot and lock without a tool.
The module comes from the market, not the machine. A 600 by 600 mm grid serves most commercial ceilings, 600 by 1200 mm covers corridors, and 500 by 500 mm appears in healthcare and cleanroom work. False ceiling roll forming on any line follows the module the buyer sells.
A false ceiling roll forming line builds both tees from the same coil, at the same speed, on the same forming stands. Only the punch die and cut length change.
So on a false ceiling roll forming line the practical question is changeover time, not capability. A die cart with pre-set punch units takes 20 to 40 minutes. A bolted and shimmed die takes half a shift, which no ceiling plant accepts twice a day.
Slots and tabs are separate operations. The main tee needs slot groups at 600 mm centres punched through the web, with a die that clears both flanges. The cross tee needs an end tab formed and punched at each end, a two stage tool because the tab bends up after the hole is cut.
That tab is where quality problems start. A tab 0.3 mm too long will not enter the slot. A tab 0.2 mm too short rattles and reads as a shadow line under lighting. Both come from punch die wear rather than the rolls, which is why spare punch inserts matter more than spare rollers.
On a 3.66 m main tee with slots at 600 mm centres there are six slot groups. Their spacing must hold within plus or minus 0.3 mm end to end, or six modules will not close against the next run. In false ceiling roll forming, that number is tighter than the section tolerance, and it is set by the feed system rather than the forming stands.
| คุณสมบัติ | ความคลาดเคลื่อน | Consequence if missed |
|---|---|---|
| Slot pitch | plus or minus 0.3 mm | Grid will not close, cross tees bind |
| Slot to tee end | บวกหรือลบ 0.5 มม. | Perimeter gap at wall angle |
| Tab length | plus or minus 0.15 mm | Loose or jammed joint |
| Face width | plus or minus 0.10 mm | Visible step between tees |
| Cut length | บวกหรือลบ 0.5 มม. | Uneven border course |
Servo feed with a measuring wheel holds those figures. A mechanical stop with a worn dog does not, and the drift only shows when the installer reaches the fifth module. Cross tee length follows the same logic: a 1200 mm tee at 1198.5 mm leaves a 1.5 mm gap in every second module.
เดอะ คู่มือติดตั้งดายตอก covers the alignment sequence that keeps these numbers stable after a die change, which is where a good line starts producing bad tee.
False ceiling roll forming is a thin gauge, high speed process. Cross tee lines reach 60 m/min and main tee lines 35 to 50 m/min. At this thickness there is almost no forming load, and the constraint moves to strip handling.
Light strip lifts off the rolls, wrinkles at the flange radius, and moves fast enough that a flying cut must finish in 60 ms.
| รายการ | Cross tee line | Main tee line |
|---|---|---|
| สแตนด์ขึ้นรูป | 14 ถึง 18 ปี | 18 ถึง 24 ปี |
| ความเร็วสายการผลิต | 45 to 60 m/min | 35 ถึง 50 ม./นาที |
| Drive per stand | 2.2 to 3.0 kW | 3.0 to 4.0 kW |
| Punch strokes | 120 to 180 per min | 80 to 120 per min |
| Cut off | กรรไกรลอย | กรรไกรลอย |
| ตัวคลายคอยล์ | 3 to 5 t | 5 to 8 t |
Coil arithmetic sets the shift. A 5 t coil of 0.35 mm by 150 mm strip holds roughly 1,150 m, which is 19 minutes at 60 m/min. A double decoiler with a coil car pays back faster here than on almost any other product, and a 60 m accumulator loop lets the mill run through a coil weld without a stop that would mark the strip.
The same logic applies to high speed roof panel lines, where the gauge is also under 0.6 mm.
Ceiling tee starts as hot dip galvanized coil, and the coating class decides whether the ceiling survives a humid building. Indoor dry areas accept Z100. Kitchens, car parks and pool halls need Z180 or a painted finish.
| เกรด | มาตรฐาน | กำลังคราก | เคลือบผิว | ใช้ |
|---|---|---|---|---|
| DX51D+Z | EN 10346 | 140 to 240 MPa | Z100 to Z275 | Standard tee |
| S250GD+Z | EN 10346 | 250 MPa | Z100 to Z275 | Stiffer tee |
| CS Type B | ASTM A653 | 205 MPa | G40 to G90 | US market tee |
| SS 275 | ASTM A653 | 275 MPa | G60 to G90 | Long span main tee |
In false ceiling roll forming, thickness follows span, not habit. A 3.66 m main tee at 0.35 mm sags with 15 kg of tile across 1.2 m hanger spacing. At 0.45 mm the same tee holds 1.5 m spacing, which cuts hanger count by a third.
Coating weight changes false ceiling roll forming too. A Z275 surface is harder than Z100 and springs back more at the hem, so heavy coating needs a different overbend.
EN 13964 governs suspended ceiling performance in Europe and the British Standards Institution publishes the test methods behind the load classes. In North America the product standard is ASTM C635, summarised through the Gypsum Association. Cold formed section tolerances are set out by SteelConstruction.info.
A tee straight on the floor can still twist once hung. In false ceiling roll forming the cause is uneven flange strain, usually a roll gap 0.02 mm different left to right, or coil camber the straightener missed.
The numbers that matter are simple. Straightness within 0.5 mm per metre, twist under 1 degree over full length, and no burr on the visible face. A burr collects dust and shows under grazing light on a white ceiling.
Hemmed edges are worth specifying. A raw edge at 0.35 mm cuts a glove and rusts first. A hem adds one pass and removes both problems. Camber is the most common cause of a rejected bundle, and it starts at the coil, so check the first 3 m of every new coil against a straight edge before touching a roll.
Five numbers turn a false ceiling roll forming quotation into a buildable specification:
A two profile false ceiling roll forming line for main tee and cross tee, with die cart and flying shear, is where most ceiling plants start. Adding wall angle and furring channel usually means a second smaller mill, because the thickness band and speed differ enough that one line serves neither well. Where profile count grows, the คู่มือไลน์หลายโปรไฟล์ covers when a cassette change beats a second machine.
For the plasterboard side of the same ceiling, the เครื่องรีดขึ้นรูปช่องฝ้าเพดาน page covers hat channel and furring profiles. If the pass structure is unfamiliar, วิธีการทำงานของเครื่องขึ้นรูปม้วน explains it.
Buyers with a non-standard module should start from custom profile engineeringและ coil selection goes deeper on grade and coating.
Believe Industry ผลิตไลน์รีดขึ้นรูปสั่งทำตั้งแต่ปี 2005 ด้วยประสบการณ์กว่า 15 ปี วิศวกรกว่า 80 คน และโครงการกว่า 500 โครงการในกว่า 50 ประเทศ ภายใต้ ISO 9001 และ CE
We size false ceiling roll forming lines against your module and coating class.
Q: What thickness does false ceiling roll forming run?
Q: Can one false ceiling roll forming line make main tee and cross tee?
Q: How fast does a false ceiling roll forming line run?
Q: Why do cross tee joints come loose on site?
Q: Does false ceiling roll forming need a flying shear?
Q: What straightness do buyers normally accept?
อัปเดตล่าสุด: 2026-11-05
บันทึกการเปลี่ยนแปลงบทความ
2026-11-05: Initial publication, backfilled into the 2026-10-28 calendar slot.
เงื่อนไขทบทวนครั้งถัดไป
EN 13964 or ASTM C635 revises ceiling load classes; a buyer requests a module below 500 mm; galvanized coating prices move the standard from Z100 to Z180.
Rolling Shutter Roll Forming: Shopfront to Warehouse Applications Short answer:...
อ่านเพิ่มเติมDoor Manufacturing Roll Forming: Residential to Industrial Applications Short answer:...
อ่านเพิ่มเติมFalse Ceiling Roll Forming Applications: T-Grid and Suspension Systems Short...
อ่านเพิ่มเติมHeavy Duty Step Beam Roll Forming: Thick Coil and High-Strength...
อ่านเพิ่มเติม