Адрес
No 1, улица Yd, район Хуэйшань, город Уси, провинция Цзянсу. 214183
Рабочие часы
С понедельника по пятницу: с 9:00 до 17:00
Суббота: 9:00 - 16:00
| Фактор | Roll formed upright column | Press brake upright |
|---|---|---|
| Profile reference | Fixed by roll tooling | Set per operator per bend |
| Hole position | Servo indexed in line | Drill fixture or magnetic drill |
| Pitch change | Punch cam plus encoder | Edit drill program |
| Straightness over 2.4 m | Tooling constant | Drift risk |
| Best fit | Repeat frames, high volume | Prototypes, one off specials |
| Способ пробивки | Скорость линии | Uprights per shift, indicative | Примечания |
|---|---|---|---|
| Гидравлическая пробивка | От 3 до 4 m/min | 100 to 170 | Dense slot patterns, heavy gauge |
| Прессовая пробивка | От 10 до 15 m/min | 400 to 600 | Standard pitch, most rack work |
| Servo rotary punch | Более 30 m/min | 1,500 to 2,500 | Light patterns, high volume |
| Ваша ситуация | Better choice | Why |
|---|---|---|
| One frame height, hundreds per month | Roll formed upright column | Punch and roll tooling amortised fast |
| Several frame heights, frequent changeover | Roll formed upright column with quick change punch cam | Changeover is an encoder job, not a drill job |
| Prototype run, fewer than 20 uprights | Press brake upright | No line setup to justify |
| One off specials and non standard brackets | Press brake upright | Flexibility beats speed |
| Very deep box section, heavy gauge, short run | Press brake upright, or a heavy gauge CTL line | Beyond standard racking roll forming |
| Buyers auditing straightness to FEM | Roll formed upright column | Tooling constant across the run |
Q: Is a roll formed upright column always cheaper?
Q: Which process gives a straighter upright?
Q: Are press brake uprights weaker?
Q: How fast should the line run?
Q: How do I change hole pitch on the line?
Q: Can one line make several upright profiles?
Marine Roll Forming Machines: 5 Shipbuilding Profiles A marine roll...
Читать далееПрофилегибочная машина для железных дорог: 5 профилей инфраструктуры. Рельсовый...
Читать далееНастройка машины для стоек вертикальных: 12 шагов к первому идеальному результату...
Читать далееЧто такое strut channel? 7 фактов по стандарту P1000 A...
Читать далееОформите подписку, чтобы продолжить чтение и получить доступ к полному архиву.
